← 返回資源中心 / Back to Resources
BHU Certification Consultancy
簡樸房認證顧問有限公司

BHU 認證流程檢查清單

BHU Certification Process Checklist

6 個簡單步驟 輕鬆完成認證 | 6 Simple Steps to Complete Certification

📋 如何使用此清單 | How to Use This Checklist

✓ 列印此清單,跟隨每個步驟完成認證流程
✓ Print this checklist and follow each step to complete the certification process

✓ 在完成每項任務後,勾選旁邊的方框
✓ Check the box next to each task after completion

✓ 如有疑問,請隨時聯絡我們的專業團隊
✓ Contact our professional team if you have any questions

⏱️ 預計完成時間 | Estimated Completion Time: 4-8 週 | 4-8 Weeks
1 初步諮詢 | Initial Consultation
⏱️ 時間 | Time: 1-2 天 | 1-2 days
致電或電郵預約免費諮詢
Call or email to book free consultation
進行電話或上門初步評估
Conduct phone or on-site initial assessment
了解單位基本情況(面積、高度等)
Understand basic unit conditions (area, height, etc.)
向顧問提出所有認證相關疑問
Ask consultant all certification-related questions
獲得免費初步建議及報價
Receive free initial advice and quotation
2 現場視察 | Site Inspection
⏱️ 時間 | Time: 3-5 天 | 3-5 days
安排專業團隊上門檢查時間
Schedule professional team on-site inspection
測量單位面積及高度
Measure unit area and height
評估 8 大範疇標準(面積、高度、消防、通風等)
Assess 8 major category standards (area, height, fire safety, ventilation, etc.)
拍照記錄單位現況
Take photos to document current unit conditions
識別需要改善的項目
Identify items that need improvement
收到初步評估報告
Receive preliminary assessment report
3 改善工程 | Improvement Works
⏱️ 時間 | Time: 1-3 週 | 1-3 weeks (視乎工程複雜程度 | depends on work complexity)
查看改善建議清單
Review improvement recommendations list
聘請認可承建商進行必要工程
Hire approved contractor for necessary works
安裝或改善消防設備
Install or improve fire safety equipment
改善通風及照明系統
Improve ventilation and lighting systems
完成防水工程(如需要)
Complete waterproofing works (if needed)
完成所有改善工程並進行驗收
Complete all improvement works and conduct acceptance
4 文件準備 | Document Preparation
⏱️ 時間 | Time: 1-2 週 | 1-2 weeks
準備所有所需文件(見下方文件清單)
Prepare all required documents (see document checklist below)
填寫 BHU-01 認證申請表格
Complete BHU-01 Certification Application Form
安排指明專業人士核證
Arrange designated professional certification
收集所有改善工程證明文件
Collect all improvement work certification documents
由顧問審核所有文件完整性
Have consultant review all documents for completeness
5 提交申請 | Submit Application
⏱️ 時間 | Time: 1-2 天 | 1-2 days
由顧問協助準備完整申請文件包
Consultant assists in preparing complete application package
向政府部門遞交認證申請
Submit certification application to government department
繳交申請費用(如適用)
Pay application fee (if applicable)
獲得申請確認回執
Receive application confirmation receipt
記錄申請編號及日期
Record application number and date
6 獲得認證 | Obtain Certification
⏱️ 時間 | Time: 2-4 週 | 2-4 weeks
等待政府部門審批
Wait for government department approval
配合政府覆核視察(如需要)
Cooperate with government follow-up inspection (if needed)
回應政府補充文件要求(如有)
Respond to government requests for additional documents (if any)
獲得 BHU 認證證書
Receive BHU certification certificate
了解認證有效期及續期要求
Understand certification validity period and renewal requirements
🎉 認證完成!開始合法經營!
🎉 Certification complete! Start legal operations!

📄 所需文件清單 | Required Documents Checklist

請確保準備以下所有文件以順利完成認證申請
Please ensure all the following documents are prepared for smooth certification application

🗂️ 基本文件 | Basic Documents

BHU-01 認證申請表格
BHU-01 Certification Application Form
土地登記冊 / 業權註冊紀錄
Land Register / Title Registration Record
申請人身分證明文件(副本)
Applicant Identity Documents (Copy)
業主書面同意書(如申請人非業主)
Owner Written Consent (if applicant is not owner)

📋 專業文件 | Professional Documents

指明專業人士核證報告
Designated Professional Certification Report
建築圖則(如有)
Building Plans (if available)
消防設備證明文件
Fire Equipment Certificates
水電設施證明文件
Water & Electricity Certificates
防水工程證明(如有進行相關工程)
Waterproofing Work Certificate (if relevant work was done)
通風及照明設備證明
Ventilation and Lighting Equipment Certificates
← 返回資源中心 / Back to Resources